top of page

FLOORING UPGRADES
Zavalla Independent School District

The floors at Zavalla ISD Junior High and High School were worn and had moisture under the existing flooring causing problems.  A new epoxy flake floor was designed and installed giving new life to the corridors and entry. 

McKINLEY-GOLDEN ASSOCIATES

415 S. First Street

Suite 300A

Lufkin, Texas 75901

936-875-2320

bottom of page